SLO 511 Information Feed

Type
City
Type Road City Description Date & Time
Lane Closure Pippin ln - county maintained portion San luis obispo fringe Bridge repair in progress. Expect delays. Will reopen when safe.
Lane Closure Santa rosa creek rd Cambria ROAD CLOSED: Closed due to flooding and mudslides. Will reopen when safe.
Lane Closure Old creek rd- from hwy 1 - hwy 46 Cayucos ROAD CLOSED: Closed due to due to flooding and mud debris. Will reopen when safe.
Lane Closure Chimney rock rd. Paso robles ROAD CLOSED: Closed due to washout. Will reopen when safe.
Lane Closure Lopez dr - beginning to lake entrance Fringe arroyo grande Road work storm debris clearance with expected delays up to 5 minutes from 7:00 A.M. to 5:00 P.M. Weather permitting. 03/06/23 - 04/21/23
Lane Closure Mill rd- at dry creek washout near 5115 mill rd Paso robles fringe ROAD CLOSED: Closed at the river crossing due to road washout. Will reopen when safe.
Lane Closure Cholame valley rd - at river crossing Paso robles fringe ROAD CLOSED: Closed at the river crossing due to flooding. Will reopen when safe.
Lane Closure Huer huero rd - at river crossing Atascadero fringe ROAD CLOSED: Closed at the river crossing due to flooding. Will reopen when safe.
Lane Closure Shell creek rd - at crossing Atascadero fringe ROAD CLOSED: Closed due to flooding. Will reopen when safe.
Lane Closure Pozo rd - avenales ranch rd to hwy 58 Arroyo grande fringe ROAD CLOSED: Beginning at Avenales Ranch Rd. to Hwy 58 due to storm damage. Will reopen when safe.
Lane Closure Camino del oro Nipomo Asphalt overlays to roads may cause up to 10 minute delays, Monday - Friday between 7 A.M. to 5 P.M. 03/07/23 - 04/14/23
Lane Closure Arroyo grande - huasna rd - at mp 2.851 Arroyo grande fringe ROAD CLOSED AT MP 2.851: Due to storm damage, road has washed out and is impassable. Will reopen when safe to do so.
Lane Closure Stage coach rd San luis obispo fringe ROAD CLOSED: Multiple issues at multiple locations. Mud slide 5/10 mile south of TV Tower Rd. Pavement cracking and falling away. Will reopen when safe to do so.
Lane Closure Huasna townsite rd - bridge 1 to end of road Arroyo grande fringe ROAD CLOSED: Closed at Bridge 1 to the end of the road. Will reopen when safe to do so.
Lane Closure Upper lopez canyon rd - beginning at dirt portion to end Arroyo grande fringe ROAD CLOSED: Beginning at dirt portion, 300 ft. from Waters End to end of dirt road. Water crossings running too high. Will reopen when safe to do so.
Lane Closure Avenales ranch rd - 1 mile at road washout Pozo ROAD CLOSED: CLOSED TO THROUGH TRAFFIC - Beginning at Pozo Rd. and also ROAD CLOSED 1 mile at road washout. Will reopen when safe.
Lane Closure Santa rita rd - marsh rd to ridge rd Templeton ROAD CLOSED: Impassable where material washed away and exposed boulders. Will reopen when safe to do so.
Lane Closure Creston road -s el pomar rd to cripple creek rd Templeton ROAD CLOSED: Closed from Neal Spring Rd to Cripple Creek Rd due to storm damage. Road will reopen when safe to do so.
Lane Closure Los palos rd and santa barbara rd Atascadero fringe ROAD CLOSED: Closed due to flooding. Will reopen when safe to do so.
Lane Closure Cholame valley rd - mcmillan canyon rd to hwy 46 Paso robles fringe ROAD CLOSED: Closed due to flooding. Will reopen when safe.